UPPER YARRA STAR MAIL
Home » Mail » Civic centre overhaul plan

Civic centre overhaul plan



By JESSE GRAHAM

BETWEEN termite and water damage, a patchwork of buildings stuck together, and Yarra Ranges Council’s main civic centre infrastructure from “the beginning of time” needs to be overhauled – and soon.
Councillors made a unanimous decision at their 11 August meeting to green light a feasibility study for the redevelopment of the Lilydale Civic Centre, at a cost of about $420,000.
Under the banner of the Flexible Future Project, two fully-costed plans mapping out the centre’s future are expected to be brought before council early next year.
In a tour of the current civic centre, Flexible Future Project director Scott Hodges described the current building as a “hodgepodge” of portables buildings and extensions connected to one another as they were needed.
“We found that the reality with this construction is that it was put together in such a hodgepodge way, without consistent, regular funding because we decided to sweat the asset – investing no more money in the building because we were hoping we’d get a new one,” he said.
In a media release, the council noted that the project was put on hold while it investigated whether it would be able to relocate to the former Swinburne campus in Lilydale.
With the plan to move to the campus falling through, Mr Hodges said the council had to assess the future of the current building, which had numerous issues including water damage, out-dated infrastructure, cracks in the walls, asbestos sheeting and repaired termite damage – just to name a few.
During the tour, Mr Hodges pointed out numerous instances of cracks, of buildings shifting due to ageing, and of infrastructure such as an air-conditioning unit, located under the main area of the building.
He said the problem for council was that simple works to improve parts of the building then triggered a requirement for other improvements to bring areas up to current compliance standards.
“The sad part is … we don’t use compliance as the major driver for the project,” he said.
“A lot of this is compliant with the standards of the time, but not compliant with modern-day standards.
“Compliance is a key element that makes a domino effect – for example, should we undertake some quite minimal refurbishment, i.e. fire systems and air-conditioning, it then triggers further elements in the building.”
The idea for how the redeveloped building would look is still under consideration, but Mr Hodges said the aim was to salvage as much of the existing building as possible while keeping a low price tag.
He refused to speculate on the costs of any redevelopment, but said that, taking delays into account, the whole project might be completed in the coming four years if it was accepted by council.

Digital Editions


More News

  • Temporary water cut off in Yarra Junction

    Temporary water cut off in Yarra Junction

    A large water burst in Yarra Junction may result in some properties losing water access today, 29 January. The burst was reported at 1.19pm and is expected to be resolved…

  • Learn to plan for fires at workshop

    Learn to plan for fires at workshop

    Purchase this photo from Pic Store: 246508 Locals of 3799 are encouraged to come along a fire planning workshop hosted by the Wesburn-Millgrove CFA on Sunday 1 February. The workshop…

  • Playlunch’s incredible Hottest 100 placement puts Yarra Ranges on the music map

    Playlunch’s incredible Hottest 100 placement puts Yarra Ranges on the music map

    The Yarra Ranges-based seven-piece band Playlunch landed an incredible fourth place in triple j’s Hottest 100, capping off a mega 2025. It was the bogan funk outfit’s breakout single Keith…

  • Lifeblood of the force give back

    Lifeblood of the force give back

    Purchase this photo from Pic Store: 531438 It was a morning of giving back for several highway patrol members from the outer east, choosing to donate blood and plasma as…

  • Full of family fun

    Full of family fun

    Crowds of people from Wandin and surrounds soaked up the sun at the annual Family Fun Day on Monday 26 January. The Rotary Club of Wandin’s Family Fun Day took…